<div dir="ltr">Dear All,<div><br></div><div>I have a question on NVE Calculation after NVT equilibration. In the literature, I always read the description like "after x picoseconds equilibration in the NVT ensemble with a target temperature of 300K, a production run of y picoseconds was performed in the NVE emsemble."  I was wondering what is "porduction run"? </div><div><br></div><div>Is that correct to run NVE calculation by using RESTART keywords to call the position and velocity files from previous NVT results?</div><div><br></div><div><div>&EXT_RESTART</div><div> RESTART_DEFAULT  <b>TRUE</b></div><div> RESTART_FILE_NAME  <b>NVT_STEP_NUMBER.restart</b></div><div> RESTART_COUNTERS  <b>TRUE</b></div><div> RESTART_POS  <b>TRUE</b></div><div> RESTART_VEL  <b>TRUE</b></div><div> RESTART_RANDOMG  <b>TRUE</b></div><div>&END EXT_RESTART</div></div><div><br></div><div>Regards,</div><div>Huan</div><div><br></div><div><br></div><div><br></div><div><br></div><div><br></div></div>