[CP2K:6507] parallel running cross nodes problem
hut... at chem.uzh.ch
hut... at chem.uzh.ch
Thu May 14 12:54:10 UTC 2015
Hi
wild guess without having any additional information.
The problem might be your network. Are you sure that you have
exclusive use of the network/nodes?
Jobs run slowly --> with constant time or strong variations of time?
Monitor your network! Monitor your load on the nodes!
regards
Juerg
--------------------------------------------------------------
Juerg Hutter Phone : ++41 44 635 4491
Institut für Chemie C FAX : ++41 44 635 6838
Universität Zürich E-mail: hut... at chem.uzh.ch
Winterthurerstrasse 190
CH-8057 Zürich, Switzerland
---------------------------------------------------------------
-----cp... at googlegroups.com wrote: -----To: cp... at googlegroups.com
From: jumin... at gmail.com
Sent by: cp... at googlegroups.com
Date: 05/14/2015 08:39AM
Subject: [CP2K:6507] parallel running cross nodes problem
Hi, anyone encounter the problem that, after running MD about 2000 steps, the jobs run slowly , when parallel running on more than one node. however, running on only one node, there is no problem.
minggang
--
You received this message because you are subscribed to the Google Groups "cp2k" group.
To unsubscribe from this group and stop receiving emails from it, send an email to cp2k+uns... at googlegroups.com.
To post to this group, send email to cp... at googlegroups.com.
Visit this group at http://groups.google.com/group/cp2k.
For more options, visit https://groups.google.com/d/optout.
More information about the CP2K-user
mailing list